Principles before processes
The 8th edition of the PMBOK Guide puts 6 principles and a management mindset ahead of the process catalogue. The 40 processes exist to serve those principles, not the other way round.
The author’s main field. Two manuals that approach the same problem from two complementary angles: the normative structure that orders a project, and the day-to-day operating system that keeps it standing while the information is still incomplete.
Most failed deliveries do not fail for lack of effort or talent. They fail because an uncertainty was seen too late, had no owner, or was escalated without a decision attached. The whole collection turns on a single idea: shortening the distance between a signal and a decision.
The 8th edition of the PMBOK Guide puts 6 principles and a management mindset ahead of the process catalogue. The 40 processes exist to serve those principles, not the other way round.
Governance, scope, schedule, finance, stakeholders, resources and risk: seven domains that are not walked through in order but run at the same time throughout the life of the project.
Five focus areas cut across every domain and form a domain × area grid: that grid is where you spot what a phase-based plan leaves out.
No standard is applied as it comes. Adapting it deliberately —and recording why— is part of the management work, not a shortcut around it.
The operating loop of the Scrum manual: a signal is observed, it produces a decision with an owner and a date, and that decision is verified. Without verification, governance is paperwork.
Enough control to decide in time and not one artefact more. Bureaucracy that changes no decision is pure cost.
The first explains how the standard is built. The second, what it feels like on a Tuesday morning.
Principles, performance domains, focus areas and the 40 processes of the 8th edition of the PMBOK Guide
A training manual that walks through the structure of PMBOK 8 and the Standard for Project Management (ANSI/PMI 99-001-2025) and makes it usable in software, hardware and embedded, AI and infrastructure projects. It includes the catalogue of inputs and outputs, the tools and techniques, the training paths and appendices on the PMO, artificial intelligence and procurement.
It is not a copy or a translation of the standard: it is original teaching material, independent and not affiliated with PMI. For the literal normative text you need the official publication.
Issue tracking and risk assessment in a delivery system aligned with PMBOK
A hybrid operating model for teams that deliver with Scrum but need the governance, traceability and decision discipline associated with PMBOK. It treats issue management and risk management as two connected capabilities, not two separate administrative exercises.
It covers the three boundaries a control system must respect, the difference between organisational and project governance, the project charter, a process mapping written for a PMO reader, and the observe-decide-verify loop.
The two manuals can be read separately, but they reinforce each other. This is the order that makes most sense depending on your starting point.
The technology collection picks up where this one ends: what happens when the project you run brings autonomous agents into the team.